Christine Kim tổng kết cuộc họp lãnh đạo lõi lần thứ 206 của Ethereum (ACDE)

robot
Đang tạo bản tóm tắt

Theo Wu, the 206th Ethereum core developer meeting summary by Christine Kim, mainly discussed: Holesky Testnet recovery plan (Holesky Testnet was interrupted due to client software configuration errors [Geth, Nethermind, and Besu's deposit contract address errors] after the Pectra upgrade, leading to chain fork. Developers discussed the plan to recover the network through large-scale penalty events, aiming to accelerate the exit of invalid validators and achieve network finality, but the recovery is expected to take several weeks), Sepolia Testnet upgrade schedule (scheduled for March 5), protocol improvement proposals: For the Holesky event, developers discussed long-term improvement measures, including unifying the execution layer (EL) configuration format, optimizing the consensus layer (CL) client's checkpoint synchronization function to improve the resilience of the Ethereum network. These improvement plans will be implemented in future upgrades (such as Fusaka).

KIM-0.33%
ETH2.86%
Xem bản gốc
Trang này có thể chứa nội dung của bên thứ ba, được cung cấp chỉ nhằm mục đích thông tin (không phải là tuyên bố/bảo đảm) và không được coi là sự chứng thực cho quan điểm của Gate hoặc là lời khuyên về tài chính hoặc chuyên môn. Xem Tuyên bố từ chối trách nhiệm để biết chi tiết.
  • Phần thưởng
  • Bình luận
  • Đăng lại
  • Chia sẻ
Bình luận
0/400
Không có bình luận
  • Ghim
Giao dịch tiền điện tử mọi lúc mọi nơi
qrCode
Quét để tải xuống ứng dụng Gate
Cộng đồng
Tiếng Việt
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)