Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Guangdong Construction Engineering: Two photovoltaic power generation projects connected to the grid and operational
People’s Finance Network, April 1—Guangdong Construction Engineering (002060) announced on April 1 that on March 31, 2026, the wholly owned subsidiary of its subsidiary Guangdong Yuedu Water Electricity Energy Investment Group Co., Ltd., Pu’er Yuedu Water Electricity Energy Co., Ltd., invested in and constructed the Wenwu Tea solar power photovoltaic complementary power generation project and the Lao Gengzhai solar power photovoltaic power generation project, which have been connected to the grid and commenced operation. Among them, the Wenwu Tea solar power photovoltaic complementary power generation project has a grid-connected capacity of 50MW, and the Lao Gengzhai solar power photovoltaic power generation project has a grid-connected capacity of 90MW.
The grid-connected operations of the above projects will have a certain positive impact on the company’s future operating performance. As of now, the company’s total installed clean energy projects that have already been put into operation are 5,553.15MW, including hydropower 380.50MW, wind power 880.36MW, photovoltaic power 3,792.29MW, independent energy storage 500MW; and hydrogen production and storage 600Nm³/h.