📢 Gate Square #Creator Campaign Phase 2# is officially live!
Join the ZKWASM event series, share your insights, and win a share of 4,000 $ZKWASM!
As a pioneer in zk-based public chains, ZKWASM is now being prominently promoted on the Gate platform!
Three major campaigns are launching simultaneously: Launchpool subscription, CandyDrop airdrop, and Alpha exclusive trading — don’t miss out!
🎨 Campaign 1: Post on Gate Square and win content rewards
📅 Time: July 25, 22:00 – July 29, 22:00 (UTC+8)
📌 How to participate:
Post original content (at least 100 words) on Gate Square related to
The Democratic proposal in the U.S. Senate aims to impose environmental fees on high-emission data centers.
According to the Gate.io News bot, Bloomberg reported that Senate Democrats have introduced the "Clean Cloud Act" draft. This draft establishes a charging mechanism for data centers that support blockchain networks and artificial intelligence models exceeding federal emission targets.
According to the bill, the U.S. Environmental Protection Agency must establish emission standards for data centers and cryptocurrency mining facilities with an IT nameplate power exceeding 100 KW, with an annual reduction target of 11%. For emissions that exceed the limit, a fee of $20 per ton of carbon dioxide equivalent will be charged, and this fee standard will be adjusted annually by $10 for inflation.